← Kembali ke Peta

DETAIL PROGRESS KNMP

100
Lokasi Progress Bergerak
32.53%
Progress Nasional
0.31%
Rata-rata per Site
0
Site Selesai 100%
TREND PROGRESS NASIONAL
TOP KENAIKAN PROGRESS
Mattiro Bombang SULAWESI SELATAN
+75%
Lasama SULAWESI TENGGARA
+59%
Lakara SULAWESI TENGGARA
+59%
Labone SULAWESI TENGGARA
+58%
Muara Sampara SULAWESI TENGGARA
+58%
Lero Pinrang SULAWESI SELATAN
+54%
Latawe SULAWESI TENGGARA
+53%
Bangko SULAWESI TENGGARA
+53%
Terapung SULAWESI TENGGARA
+53%
Bone Pute SULAWESI SELATAN
+52%
Lumpue SULAWESI SELATAN
+51%
Tamarupa SULAWESI SELATAN
+51%
Bungeng SULAWESI SELATAN
+51%
Bassiang Timur SULAWESI SELATAN
+50%
Borimasunggu SULAWESI SELATAN
+52%
RANKING PROVINSI
Provinsi Total Site Avg Completion Hub Penyangga
SULAWESI TENGGARA 15 45.53% 4 11
SULAWESI SELATAN 50 37.68% 7 43
SULAWESI BARAT 6 32.83% 0 6
SULAWESI TENGAH 14 29.50% 2 12
GORONTALO 11 18.00% 1 10
SULAWESI UTARA 8 1.00% 2 6
TOP 10 PROVINSI
ProvinsiAvg Completion
SULAWESI TENGGARA 45.53%
SULAWESI SELATAN 37.68%
SULAWESI BARAT 32.83%
SULAWESI TENGAH 29.50%
GORONTALO 18.00%
SULAWESI UTARA 1.00%
DISTRIBUSI PROGRESS NASIONAL
0%
4
1-25%
26
26-50%
59
51-75%
15
76-99%
0
100%
0
PROGRESS TERBARU
Dusunan
SULAWESI TENGAH

27% pekerjaan pondasi batu belah es portabel
pekerjaan pondasi batu belah es portabel
2026-09-08 09:03:00
Ulu Sawa
SULAWESI TENGGARA

25% Pek Pembesian & Pondasi
_ pembesian _ pemasangan bekesting batako untuk pondasi tapak
2026-09-08 08:58:00
Ponjalae
SULAWESI SELATAN

14% Pekerjaan Pemancanagan cerucut dolken
•pemancangan cerurut Dolken •Pengecoran pondasi tapak
2026-09-08 08:57:00
Tasiwalie
SULAWESI SELATAN

10% Pekerjaan DPT dan Pembesian
* Pek. Pemasangan cerucuk dolken * Pek. Pemasangan bekisting tapak dinding penahan tanah * Fabrikasi pembesian
2026-09-07 19:40:00
Lero Pinrang
SULAWESI SELATAN

26% Pekerjaan Pabrik Es Portable, Tambatan Perahu dan Tangki Air
* Pek.Urugan Tanah dan pemadatan tanah bangunan pabrik es,gudang beku portable * Pengecoran pile cap dan tie beam bangunan tangki air * Pek.Pemasangan tiang tambatan perahu
2026-09-07 19:37:00
Lakawali Pantai
SULAWESI SELATAN

21% Pekerjaan DPT
* Perakitan besi tapak DPT
2026-09-07 18:59:00
Mattiro Bombang
SULAWESI SELATAN

32% Pekerjaan Shelter Pendaratan Ikan dan DPT
* Pembesian kolom K2 beton bangunan shelter pendaratan ikan * Pengecoran Tapak Beton Dinding Penahan Tanah * Fabrikasi Pembesian
2026-09-07 18:28:00
Bulete
SULAWESI SELATAN

23% Pekerjaan Pabrik Es Portable & Kios Perbekalan
Pengecoran Pondasi Tapak Pemasangan Bekisting Foot Plate
2026-09-07 18:25:00
Takkalala
SULAWESI SELATAN

11% Leveling Lahan
• leveling lahan
2026-09-07 18:12:00
Bassiang Timur
SULAWESI SELATAN

30% Pekerjaan DPT
Pekerjaan Pemasangan Tulangan Pembesian DPT
2026-09-07 17:37:00
DETAIL SITE
Site Provinsi Status Completion Updated
SITE00146
Malalan
SULAWESI TENGAH PENYANGGA 12% 2026-10-28 09:33:20 Lihat Site
SITE00151
Sumpang Binangae
SULAWESI SELATAN PENYANGGA 10% 2026-10-29 11:08:38 Lihat Site
SITE00132
Taula'a
GORONTALO PENYANGGA 9% 2026-10-26 12:18:47 Lihat Site
SITE00180
Naha 1
SULAWESI UTARA PENYANGGA 3% 2026-11-02 09:34:17 Lihat Site
SITE00145
Lero Donggala
SULAWESI TENGAH PENYANGGA 2% 2026-10-28 09:29:42 Lihat Site
SITE00181
Gangga 2
SULAWESI UTARA PENYANGGA 2% 2026-10-30 13:11:17 Lihat Site
SITE00179
Kahuhu
SULAWESI UTARA PENYANGGA 2% 2026-10-29 13:17:16 Lihat Site
SITE00106
Muara Bone
GORONTALO PENYANGGA 1% 2026-10-08 15:55:53 Lihat Site
SITE00133
Tontayuo
GORONTALO PENYANGGA 1% 2026-10-26 12:18:15 Lihat Site
SITE00182
Lamanggo
SULAWESI UTARA HUB 1% 2026-10-29 13:21:33 Lihat Site