DETAIL PROGRESS KNMP

100
Lokasi Progress Bergerak
32.53%
Progress Nasional
0.31%
Rata-rata per Site
0
Site Selesai 100%
TREND PROGRESS NASIONAL
TOP KENAIKAN PROGRESS
Mattiro Bombang SULAWESI SELATAN
+75%
Lasama SULAWESI TENGGARA
+59%
Lakara SULAWESI TENGGARA
+59%
Labone SULAWESI TENGGARA
+58%
Muara Sampara SULAWESI TENGGARA
+58%
Lero Pinrang SULAWESI SELATAN
+54%
Bangko SULAWESI TENGGARA
+53%
Latawe SULAWESI TENGGARA
+53%
Bone Pute SULAWESI SELATAN
+52%
Terapung SULAWESI TENGGARA
+53%
Lumpue SULAWESI SELATAN
+51%
Tamarupa SULAWESI SELATAN
+51%
Bungeng SULAWESI SELATAN
+51%
Takkalasi SULAWESI SELATAN
+51%
Tondasi SULAWESI TENGGARA
+50%
RANKING PROVINSI
Provinsi Total Site Avg Completion Hub Penyangga
SULAWESI TENGGARA 15 45.53% 4 11
SULAWESI SELATAN 50 37.68% 7 43
SULAWESI BARAT 6 32.83% 0 6
SULAWESI TENGAH 14 29.50% 2 12
GORONTALO 11 18.00% 1 10
SULAWESI UTARA 8 1.00% 2 6
TOP 10 PROVINSI
ProvinsiAvg Completion
SULAWESI TENGGARA 45.53%
SULAWESI SELATAN 37.68%
SULAWESI BARAT 32.83%
SULAWESI TENGAH 29.50%
GORONTALO 18.00%
SULAWESI UTARA 1.00%
DISTRIBUSI PROGRESS NASIONAL
0%
4
1-25%
26
26-50%
59
51-75%
15
76-99%
0
100%
0
PROGRESS TERBARU
Lero Pinrang
SULAWESI SELATAN

30% Pekerjaan DPT, Docking Perahu dan Tangki Air
* Pek. Pengecoran tapak dinding penahan tanah * Pek.Pemasangan wermes pada lantai bangunan docking perahu * Pek. Pemasangan pondasi batu kali bangunan genset * Pek. Pembesian besi ringbalk dan tulangan lantai bangunan tangki air * Pek. Pemasangan bekisting pada bangunan tangki air * Pek. Tambatan perahu pemasangan tiang tambatan
2026-09-17 10:23:00
Tubo Selatan
SULAWESI BARAT

15% Pekerjaan DPT
•Pek.pemasangan cerucuk dolken •pek.galian tnah untuk DPT
2026-09-16 19:59:00
Tasiwalie
SULAWESI SELATAN

17% Pekerjaan DPT dan Pembesian
* Pek. Pengecoran dinding penahan tanah * Fabrikasi pembesian
2026-09-16 16:21:00
Takkalala
SULAWESI SELATAN

22% Pekerjaan pondasi tapak
• pengecoran pondasi tapak
2026-09-16 16:17:00
Tirowali
SULAWESI SELATAN

29% Pekerjaan Rumah Genset dan Tangki Air
-Pekerjaan pemasangan bata di bangunan rumah genset -Pekerjaan pengecoran pile cap dan TB 1 di bangunan tangki air
2026-09-16 16:12:00
Kupa
SULAWESI SELATAN

13% Pekerjaan DPT dan Pembesian
* Fabrikasi Pembesian * Pengecoran Dinding Penahan Tanah
2026-09-16 16:08:00
Takkalasi
SULAWESI SELATAN

50% Pekerjaan Kios Perbekalan
* Pemasangan Bekisting Kolom Bangunan Kios Perbekalan
2026-09-16 16:06:00
Padang Kalua
SULAWESI SELATAN

20% Pekerjaan Pembesian
•perakitan pembesian •pemancangan cerucut dolken
2026-09-16 10:15:00
Pangalasiang
SULAWESI TENGAH

3% Land Clearing + Direksi Keet

2026-09-16 10:05:00
Tamarupa
SULAWESI SELATAN

38% Pekerjaan Pabrik Es, Kios Perbekalan, Shelter Pendaratan Ikan, Levelling Lahan dan Pembesian
* Pembuatan Turap Penahan Tanah Timbun * Acian Finishing Dinding Pabrik Es Portabel * Pemasangan Bekisting Sloof Bangunan kios Perbekalan * Pemasangan Bekisting Kolom Bangunan Shelter Pendaratan Ikan * Tanah Urug Leveling lahan * Fabrikasi Pembesian
2026-09-15 17:31:00
DETAIL SITE
Site Provinsi Status Completion Updated
SITE00020
Songka
SULAWESI SELATAN PENYANGGA 24% 2026-10-26 11:14:24 Lihat Site
SITE00152
Darubiah
SULAWESI SELATAN PENYANGGA 23% 2026-10-28 10:24:05 Lihat Site
SITE00150
Siddo
SULAWESI SELATAN PENYANGGA 21% 2026-10-29 11:07:18 Lihat Site
SITE00139
Muara Tinobu
SULAWESI TENGGARA PENYANGGA 21% 2026-11-02 10:12:33 Lihat Site
SITE00087
Watang soreang
SULAWESI SELATAN PENYANGGA 18% 2026-10-27 09:34:27 Lihat Site
SITE00114
Biluhu Tengah
GORONTALO PENYANGGA 15% 2026-10-20 11:59:38 Lihat Site
SITE00131
Olimeyala
GORONTALO PENYANGGA 15% 2026-10-26 12:19:33 Lihat Site
SITE00111
Olimoo'O
GORONTALO PENYANGGA 15% 2026-10-20 11:58:48 Lihat Site
SITE00085
Moilong
SULAWESI TENGAH PENYANGGA 14% 2026-10-21 09:41:32 Lihat Site
SITE00146
Malalan
SULAWESI TENGAH PENYANGGA 12% 2026-10-28 09:33:20 Lihat Site