← Kembali ke Peta

DETAIL PROGRESS KNMP

100
Lokasi Progress Bergerak
32.53%
Progress Nasional
0.31%
Rata-rata per Site
0
Site Selesai 100%
TREND PROGRESS NASIONAL
TOP KENAIKAN PROGRESS
Mattiro Bombang SULAWESI SELATAN
+75%
Lakara SULAWESI TENGGARA
+59%
Lasama SULAWESI TENGGARA
+59%
Labone SULAWESI TENGGARA
+58%
Muara Sampara SULAWESI TENGGARA
+58%
Lero Pinrang SULAWESI SELATAN
+54%
Bangko SULAWESI TENGGARA
+53%
Latawe SULAWESI TENGGARA
+53%
Bone Pute SULAWESI SELATAN
+52%
Terapung SULAWESI TENGGARA
+53%
Tamarupa SULAWESI SELATAN
+51%
Bungeng SULAWESI SELATAN
+51%
Lumpue SULAWESI SELATAN
+51%
Takkalasi SULAWESI SELATAN
+51%
Tondasi SULAWESI TENGGARA
+50%
RANKING PROVINSI
Provinsi Total Site Avg Completion Hub Penyangga
SULAWESI TENGGARA 15 45.53% 4 11
SULAWESI SELATAN 50 37.68% 7 43
SULAWESI BARAT 6 32.83% 0 6
SULAWESI TENGAH 14 29.50% 2 12
GORONTALO 11 18.00% 1 10
SULAWESI UTARA 8 1.00% 2 6
TOP 10 PROVINSI
ProvinsiAvg Completion
SULAWESI TENGGARA 45.53%
SULAWESI SELATAN 37.68%
SULAWESI BARAT 32.83%
SULAWESI TENGAH 29.50%
GORONTALO 18.00%
SULAWESI UTARA 1.00%
DISTRIBUSI PROGRESS NASIONAL
0%
4
1-25%
26
26-50%
59
51-75%
15
76-99%
0
100%
0
PROGRESS TERBARU
Mabonta
SULAWESI SELATAN

21% Pekerjaan Pabrik Es dan Shelter Pendaratan Ikan
* galian pondasi pabrik es portabel * pengecoran tiang selter pendaratan ikan
2026-09-29 19:17:00
Muara Tinobu
SULAWESI TENGGARA

18% Pekerjaan DPT
* Pekerjaan Dinding penahan Tanah ( DPT)
2026-09-29 19:15:00
Bawalipu
SULAWESI SELATAN

19% Pekerjaan pembesian dan pondasi
• Perakitan pembesian • Pemasangan pondasi
2026-09-29 19:09:00
Terapung
SULAWESI TENGGARA

30% Pekerjaan Tambatan perahu dan Perataan Tanah

2026-09-29 19:06:00
Siddo
SULAWESI SELATAN

10% Pekerjaan Jalan Kawasan
* Fabrikasi Pembesian Tapak Foot Plate Jalan Kawasan * Galian Tapak Jalan Kawasan
2026-09-29 19:03:00
Tubo Poang
SULAWESI BARAT

20% Pekerjaan DPT
•pek.pembesian DPT •pek.pengecoran tapak DPT
2026-09-29 18:55:00
Mekkatta Selatan
SULAWESI BARAT

22% Pekerjaan DPT
* pek.pembesian DPT * pek.pengecoran tapak DPT
2026-09-29 17:44:00
Malalan
SULAWESI TENGAH

4% Pek Persiapan

2026-09-29 16:43:00
Limbua
SULAWESI BARAT

25% Pekerjaan Shelter Pendaratan Ikan dan DPT
* pek.pasangan pondasi shelter pendaratan ikan * pek.bekisting dpt
2026-09-29 02:57:00
Tamarupa
SULAWESI SELATAN

48% Pekerjaan Kios Perbekalan, Saluran dan Shelter Pendaratan Ikan
* Plesteran dinding bangunan kios perbekalan * Galian Septictank Bangunan Kios Perbekalan * Pembuatan Saluran Lingkungan * Pembuatan Rangka Atap Beton Bangunan Shelter Pendaratan Ikan * Fabrikasi Pembesian
2026-09-28 20:13:00
DETAIL SITE
Site Provinsi Status Completion Updated
SITE00178
Pulau Miangas
SULAWESI UTARA PENYANGGA 0% 2026-10-29 13:37:18 Lihat Site
SITE00177
Tambulang Pantai
SULAWESI UTARA PENYANGGA 0% Lihat Site
SITE00176
Tanjung Sidupa
SULAWESI UTARA PENYANGGA 0% Lihat Site
SITE00165
Bolangitang I
SULAWESI UTARA HUB 0% Lihat Site